Manufacturing·Probable
North River Wastewater Treatment Plant
725 West 135th Street
Estimated MW
21.9
Score
69
Nearest sub.
69 kV
1216.0 mi away
Signal profile
- Power60% of score10021.9 MW est.Footprint × archetype W/m²
- Grid proximity25% of score101216.0 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint9627.1 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (69). The rest are corroborating context.
Underutilization signals
- 1266 Apartment Corp. · Fort Lee, NJ81 layoffs
- Acme Markets Inc. · Edgewater, NJ115 layoffs
- IPIC Theaters · Fort Lee, NJ97 layoffs
Location
Coordinates
40.82669, -73.95577
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
21.9 MW