Aerial view of Central Service Facility
Manufacturing·Speculative

Central Service Facility

Estimated MW
12.6
 
Score
64
 
Nearest sub.
69 kV
858.5 mi away

Signal profile

Power93Grid proximity10Voltage class40Footprint92Underutilization35Data confidence80
  • Power60% of score93
    12.6 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    858.5 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint92
    15.6 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (64). The rest are corroborating context.

Location

Coordinates
42.39868, -83.03067
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
12.6 MW