Manufacturing·Speculative
Performance Manufacturing Center
2500 Honda Parkway Marysville
Estimated MW
6.3
Score
54
Nearest sub.
69 kV
747.0 mi away
Signal profile
- Power60% of score756.3 MW est.Footprint × archetype W/m²
- Grid proximity25% of score10747.0 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint847.7 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (54). The rest are corroborating context.
Location
Coordinates
40.27930, -83.52482
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
6.3 MW