Manufacturing·Speculative
New Shepard Launch Pad
Estimated MW
5.4
Score
56
Nearest sub.
138 kV
21.5 mi away
Signal profile
- Power60% of score725.4 MW est.Footprint × archetype W/m²
- Grid proximity25% of score1021.5 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint816.7 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (56). The rest are corroborating context.
Location
Coordinates
31.42286, -104.75727
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.4 MW