← All sites
Aerial view of New Shepard Launch Pad
Manufacturing·Speculative

New Shepard Launch Pad

Estimated MW
5.4
 
Score
56
 
Nearest sub.
138 kV
21.5 mi away

Signal profile

Power72Grid proximity10Voltage class70Footprint81Underutilization35Data confidence80
  • Power60% of score72
    5.4 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    21.5 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score70
    138 kV nearestHIFLD transmission
  • Footprint81
    6.7 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (56). The rest are corroborating context.

Location

Coordinates
31.42286, -104.75727
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.4 MW