Kimberly-Clark
2466 FM 137 Paris
Signal profile
- Power60% of score9313.3 MW est.Footprint × archetype W/m²
- Grid proximity25% of score960.2 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint10082.1 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (90). The rest are corroborating context.
Intelligence
The Kimberly-Clark site is a strong candidate for a small data center or container-BESS deployment due to its proximity to a high-voltage substation and relatively low estimated load, indicating potential underutilization of existing power infrastructure. However, the key risk lies in the speculative nature of the site and lack of underutilization corroboration. Further investigation is needed to confirm the site's suitability.
The Kimberly-Clark site is a warehouse and logistics facility with an estimated load of 13.28 MW, which is relatively low considering its large area. Given its proximity to a 138 kV substation, just 0.21 miles away, the site could potentially support a small data center or container-BESS deployment, leveraging the existing high-voltage transmission infrastructure. The site's speculative tier and lack of underutilization corroboration, however, introduce uncertainty and highlight the need for further assessment to determine its viability as a stranded-power or underutilized industrial site.