Manufacturing·Speculative
TECO-Westinghouse
5100 North Interstate 35 Round Rock
Estimated MW
7.2
Score
82
Nearest sub.
138 kV
0.2 mi away
Signal profile
- Power60% of score797.2 MW est.Footprint × archetype W/m²
- Grid proximity25% of score960.2 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint878.9 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (82). The rest are corroborating context.
Location
Coordinates
30.56953, -97.69614
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
7.2 MW