← All sites
Aerial view of Unnamed Manufacturing
Manufacturing·Probable

Unnamed Manufacturing

Estimated MW
4.8
 
Score
49
 
Nearest sub.
69 kV
669.1 mi away

Signal profile

Power68Grid proximity10Voltage class40Footprint55Underutilization82Data confidence80
  • Power60% of score68
    4.8 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    669.1 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint55
    2.0 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (49). The rest are corroborating context.

Underutilization signals

  • Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn

Location

Coordinates
41.88977, -87.89769
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
4.8 MW