← All sites
Aerial view of Amazon Fulfillment Center MDW9
Warehouse / Logistics·Probable

Amazon Fulfillment Center MDW9

2865 Duke Parkway Aurora

Estimated MW
3.5
 
Score
40
 
Nearest sub.
69 kV
656.2 mi away

Signal profile

Power53Grid proximity10Voltage class40Footprint94Underutilization82Data confidence80
  • Power60% of score53
    3.5 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    656.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint94
    21.9 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (40). The rest are corroborating context.

Underutilization signals

  • Heartland Human Care Services (International Children Center at Beverly) · 1209 W 98th St., Chicago, IL 60643underutilization_warn
  • Resilience Healthcare - West Suburban Medical Center, LLC · 3 Erie Ct, Oak Park, IL 60302underutilization_warn

Location

Coordinates
41.81504, -88.21210
Archetype
Warehouse / Logistics
Confidence tier
Probable
Estimated load
3.5 MW