Aerial view of Distribution Concepts / Trenco
Manufacturing·Speculative

Distribution Concepts / Trenco

Estimated MW
3.2
 
Score
38
 
Nearest sub.
69 kV
1074.3 mi away

Signal profile

Power49Grid proximity10Voltage class40Footprint73Underutilization35Data confidence80
  • Power60% of score49
    3.2 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1074.3 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint73
    3.9 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (38). The rest are corroborating context.

Location

Coordinates
41.22866, -77.06572
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
3.2 MW