Aerial view of Urbacon Data Centre
Manufacturing·Speculative

Urbacon Data Centre

Estimated MW
3.0
 
Score
37
 
Nearest sub.
69 kV
1050.6 mi away

Signal profile

Power47Grid proximity10Voltage class40Footprint72Underutilization35Data confidence80
  • Power60% of score47
    3.0 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1050.6 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint72
    3.7 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (37). The rest are corroborating context.

Location

Coordinates
43.74064, -79.62063
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
3.0 MW