← All sites
Aerial view of Unnamed Manufacturing
Manufacturing·Probable

Unnamed Manufacturing

Estimated MW
5.2
 
Score
51
 
Nearest sub.
69 kV
670.6 mi away

Signal profile

Power71Grid proximity10Voltage class40Footprint71Underutilization82Data confidence80
  • Power60% of score71
    5.2 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    670.6 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint71
    3.2 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (51). The rest are corroborating context.

Underutilization signals

  • Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn

Location

Coordinates
41.90050, -87.86581
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
5.2 MW