Aerial view of Port Harlingen
Warehouse / Logistics·Probable

Port Harlingen

Estimated MW
25.4
 
Score
88
 
Nearest sub.
1.0 mi away

Signal profile

Power100Grid proximity83Voltage class50Footprint100Underutilization82Data confidence80
  • Power60% of score100
    25.4 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score83
    1.0 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score50
    HIFLD transmission
  • Footprint100
    157.1 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    75% fields · enrichedField coverage

Axes marked “% of score” are the weighted components of the headline composite (88). The rest are corroborating context.

Intelligence

The Port Harlingen site is a strong candidate for a small data center or container-BESS deployment due to its probable underutilization and proximity to a substation, but the unknown substation voltage poses a key risk. The site's logistics and warehouse archetype suggests existing infrastructure that could support a containerized deployment. However, further investigation into the substation's capacity and voltage is necessary.

The Port Harlingen site is a warehouse and logistics facility with a probable underutilization of its power capacity, making it an attractive candidate for a small data center or container-BESS deployment. With an estimated load of 25.43 MW and a distance of only 1 mile to the nearest substation, the site has a strong potential for a containerized deployment given its existing service. However, the unknown substation voltage poses a significant risk that must be mitigated through further investigation. The site's logistics and warehouse archetype suggests that it may have existing infrastructure, such as parking and security, that could support a containerized deployment. Overall, the Port Harlingen site is a promising candidate, but requires further due diligence to confirm its viability.

Underutilization signals

  • Cardone Industries-Harlingen · Harlingen, Cameron County, TX41 layoffs · 2026-01-26T00:00:00.000

Location

Coordinates
26.20236, -97.59883
Archetype
Warehouse / Logistics
Confidence tier
Probable
Estimated load
25.4 MW