← All sites
Aerial view of Stillwater Water Treatment Plant
Warehouse / Logistics·Speculative

Stillwater Water Treatment Plant

Estimated MW
12.4
 
Score
64
 
Nearest sub.
69 kV
161.2 mi away

Signal profile

Power92Grid proximity10Voltage class40Footprint100Underutilization35Data confidence80
  • Power60% of score92
    12.4 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    161.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint100
    76.9 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (64). The rest are corroborating context.

Location

Coordinates
36.20490, -97.07539
Archetype
Warehouse / Logistics
Confidence tier
Speculative
Estimated load
12.4 MW