Odessa Industrial Park
Signal profile
- Power60% of score10024.8 MW est.Footprint × archetype W/m²
- Grid proximity25% of score880.7 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100153.3 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (92). The rest are corroborating context.
Intelligence
The Odessa Industrial Park is a strong candidate for a small data center or container-BESS deployment due to its underutilized power capacity and proximity to a high-voltage substation. The key risk lies in verifying the accuracy of the estimated load and underutilization. Further site assessment is necessary to confirm the site's potential.
The Odessa Industrial Park is a logistics and warehouse facility with an estimated load of 24.81 MW, suggesting potential for underutilized power capacity. Given its proximity to a 138 kV substation, the site is well-suited for a container-BESS or edge data center deployment, which could capitalize on the existing grid interconnection. However, the accuracy of the estimated load and underutilization needs to be verified to mitigate potential risks and ensure the site's viability for such a project.
Likely contacts
- Phone
- +1 (432) 305-0014
Contacts are model-researched from public web sources and shown only when a source is attached. Verify before outreach.
Underutilization signals
- Cygnus Home Services LLC. (Odessa) · Odessa, Ector County, TX8 layoffs · 2023-10-26T00:00:00.000