← All sites
Aerial view of Texas Instruments
Warehouse / Logistics·Probable

Texas Instruments

12500 TI Boulevard Dallas

Estimated MW
45.1
 
Score
94
 
Nearest sub.
138 kV
0.3 mi away

Signal profile

Power100Grid proximity94Voltage class70Footprint100Underutilization82Data confidence100
  • Power60% of score100
    45.1 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score94
    0.3 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score70
    138 kV nearestHIFLD transmission
  • Footprint100
    278.5 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence100
    100% fields · enrichedField coverage

Axes marked “% of score” are the weighted components of the headline composite (94). The rest are corroborating context.

Intelligence

The Texas Instruments site is a strong candidate for a small data center or container-BESS deployment due to its underutilization and proximity to a high-voltage substation. The key risk is the potential for existing industrial operations to ramp up and reclaim the underutilized power capacity. Further site assessment is needed to confirm the feasibility of the project.

The Texas Instruments site is a warehouse and logistics facility with a probable underutilization of its power capacity, estimated to be around 45 MW. Given its proximity to a 138 kV substation, just 0.3 miles away, the site is well-positioned for a container-BESS or edge data center deployment, which could capitalize on the existing grid interconnection. The facility's history and current operations suggest a potential for repurposing underutilized space and power capacity, but the key risk is the potential for existing industrial operations to reclaim this capacity, highlighting the need for further assessment and discussions with facility management.

Underutilization signals

  • Texas Instruments (DFAB) · Dallas, Dallas County, TX163 layoffs · 2025-12-12T00:00:00.000

Location

Coordinates
32.92832, -96.75501
Archetype
Warehouse / Logistics
Confidence tier
Probable
Estimated load
45.1 MW