Manufacturing·Speculative
Haynes Distribution Center
1625 Green Mount Parkways James City County
Estimated MW
5.2
Score
52
Nearest sub.
—
1018.8 mi away
Signal profile
- Power60% of score715.2 MW est.Footprint × archetype W/m²
- Grid proximity25% of score101018.8 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score50—HIFLD transmission
- Footprint806.4 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence6075% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (52). The rest are corroborating context.
Location
Coordinates
37.20558, -76.59500
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.2 MW