← All sites
Aerial view of Haynes Distribution Center
Manufacturing·Speculative

Haynes Distribution Center

1625 Green Mount Parkways James City County

Estimated MW
5.2
 
Score
52
 
Nearest sub.
—
1018.8 mi away

Signal profile

Power71Grid proximity10Voltage class50Footprint80Underutilization35Data confidence60
  • Power60% of score71
    5.2 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1018.8 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score50
    —HIFLD transmission
  • Footprint80
    6.4 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence60
    75% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (52). The rest are corroborating context.

Location

Coordinates
37.20558, -76.59500
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.2 MW