Manufacturing·Probable
Unnamed Manufacturing
Estimated MW
19.0
Score
68
Nearest sub.
69 kV
671.0 mi away
Signal profile
- Power60% of score9919.0 MW est.Footprint × archetype W/m²
- Grid proximity25% of score10671.0 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint785.9 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (68). The rest are corroborating context.
Underutilization signals
- Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn
Location
Coordinates
41.90923, -87.87035
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
19.0 MW