← All sites
Aerial view of A.B. Jewell Water Treatment Plant
Warehouse / Logistics·Speculative

A.B. Jewell Water Treatment Plant

Estimated MW
12.8
 
Score
69
 
Nearest sub.
138 kV
168.0 mi away

Signal profile

Power93Grid proximity10Voltage class70Footprint100Underutilization35Data confidence80
  • Power60% of score93
    12.8 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    168.0 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score70
    138 kV nearestHIFLD transmission
  • Footprint100
    79.0 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (69). The rest are corroborating context.

Location

Coordinates
36.13564, -95.76641
Archetype
Warehouse / Logistics
Confidence tier
Speculative
Estimated load
12.8 MW