← All sites
Aerial view of Kenedy Gas Plant
Warehouse / Logistics·Speculative

Kenedy Gas Plant

Estimated MW
16.4
 
Score
93
 
Nearest sub.
345 kV
1.2 mi away

Signal profile

Power96Grid proximity81Voltage class100Footprint100Underutilization35Data confidence100
  • Power60% of score96
    16.4 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score81
    1.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score100
    345 kV nearestHIFLD transmission
  • Footprint100
    101.3 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence100
    100% fields · enrichedField coverage

Axes marked “% of score” are the weighted components of the headline composite (93). The rest are corroborating context.

Intelligence

The Kenedy Gas Plant is a strong candidate for a small data center or container-BESS deployment due to its proximity to a high-voltage substation and underutilized industrial space. However, the key risk lies in the speculative nature of the site and lack of underutilization corroboration. Further site assessment is necessary to confirm its viability.

The Kenedy Gas Plant, categorized as a warehouse_logistics facility, presents an opportunity for repurposing its underutilized space for small-scale data center or battery energy storage systems. With an estimated load of 16.39 MW and proximity to a 345 kV substation just 1.17 miles away, the site benefits from existing high-capacity grid interconnection. The speculative tier of the site and absence of underutilization corroboration introduce uncertainty, necessitating a detailed site evaluation to determine its suitability for such deployments.

Likely contacts

Operator
HEADINGTON ENERGY PARTNERS, LLC
Website
linkedin.com/company/nac-services

Contacts are model-researched from public web sources and shown only when a source is attached. Verify before outreach.

Location

Coordinates
28.75461, -98.01451
Archetype
Warehouse / Logistics
Confidence tier
Speculative
Estimated load
16.4 MW