← All sites
Aerial view of Rheem Manufacturing
Manufacturing·Speculative

Rheem Manufacturing

Estimated MW
16.3
 
Score
68
 
Nearest sub.
119.8 mi away

Signal profile

Power96Grid proximity10Voltage class50Footprint93Underutilization35Data confidence60
  • Power60% of score96
    16.3 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    119.8 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score50
    HIFLD transmission
  • Footprint93
    20.1 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence60
    75% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (68). The rest are corroborating context.

Location

Coordinates
35.32537, -94.38985
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
16.3 MW