Manufacturing·Speculative
GA3 (Cybercab)
Estimated MW
5.3
Score
75
Nearest sub.
138 kV
0.6 mi away
Signal profile
- Power60% of score715.3 MW est.Footprint × archetype W/m²
- Grid proximity25% of score880.6 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint806.6 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (75). The rest are corroborating context.
Location
Coordinates
30.21936, -97.61740
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.3 MW