← All sites
Aerial view of GA3 (Cybercab)
Manufacturing·Speculative

GA3 (Cybercab)

Estimated MW
5.3
 
Score
75
 
Nearest sub.
138 kV
0.6 mi away

Signal profile

Power71Grid proximity88Voltage class70Footprint80Underutilization35Data confidence80
  • Power60% of score71
    5.3 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score88
    0.6 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score70
    138 kV nearestHIFLD transmission
  • Footprint80
    6.6 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (75). The rest are corroborating context.

Location

Coordinates
30.21936, -97.61740
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.3 MW