← All sites
Aerial view of Unnamed Manufacturing
Manufacturing·Probable

Unnamed Manufacturing

Estimated MW
2.3
 
Score
31
 
Nearest sub.
69 kV
670.6 mi away

Signal profile

Power38Grid proximity10Voltage class40Footprint37Underutilization82Data confidence80
  • Power60% of score38
    2.3 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    670.6 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint37
    0.9 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (31). The rest are corroborating context.

Underutilization signals

  • Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn

Location

Coordinates
41.91177, -87.88820
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
2.3 MW