← All sites
Aerial view of Corle Building Systems
Manufacturing·Speculative

Corle Building Systems

404 Sara Furnace Imler

Estimated MW
4.3
 
Score
45
 
Nearest sub.
69 kV
976.2 mi away

Signal profile

Power62Grid proximity10Voltage class40Footprint77Underutilization35Data confidence80
  • Power60% of score62
    4.3 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    976.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint77
    5.3 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (45). The rest are corroborating context.

Location

Coordinates
40.20388, -78.51468
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
4.3 MW