← All sites
Aerial view of Unnamed Manufacturing
Manufacturing·Probable

Unnamed Manufacturing

Estimated MW
12.2
 
Score
64
 
Nearest sub.
69 kV
670.9 mi away

Signal profile

Power92Grid proximity10Voltage class40Footprint76Underutilization82Data confidence80
  • Power60% of score92
    12.2 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    670.9 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint76
    5.0 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (64). The rest are corroborating context.

Underutilization signals

  • Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn

Location

Coordinates
41.90533, -87.86578
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
12.2 MW