Manufacturing·Probable
Unnamed Manufacturing
Estimated MW
4.5
Score
47
Nearest sub.
69 kV
670.9 mi away
Signal profile
- Power60% of score644.5 MW est.Footprint × archetype W/m²
- Grid proximity25% of score10670.9 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint461.4 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (47). The rest are corroborating context.
Underutilization signals
- Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn
Location
Coordinates
41.90590, -87.86532
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
4.5 MW