Manufacturing·Speculative
Lighthouse Electric Pre-Fab Facility
260 Ellis Avenue Washington
Estimated MW
3.3
Score
39
Nearest sub.
69 kV
890.8 mi away
Signal profile
- Power60% of score503.3 MW est.Footprint × archetype W/m²
- Grid proximity25% of score10890.8 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint734.1 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (39). The rest are corroborating context.
Location
Coordinates
40.16887, -80.27276
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
3.3 MW