Riot Rockdale
Signal profile
- Power60% of score9616.2 MW est.Footprint × archetype W/m²
- Grid proximity25% of score990.0 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100100.1 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (93). The rest are corroborating context.
Intelligence
The Riot Rockdale site is a strong candidate for a small data center or container-BESS deployment due to its proximity to a high-voltage substation and underutilized industrial space. However, the key risk lies in the speculative nature of the site and lack of corroboration for underutilization. Further verification is needed to confirm the site's potential.
The Riot Rockdale site is a warehouse and logistics facility with an estimated load of 16.21 MW, which suggests potential for stranded power. Given its proximity to a 138 kV substation, just 0.04 miles away, the site is well-positioned for a container-BESS or edge data center deployment, which could capitalize on existing grid interconnection. The speculative nature of the site and lack of underutilization corroboration introduce uncertainty, but the site's characteristics make it an attractive candidate for further exploration. With verification of underutilization and assessment of existing infrastructure, the site could be repurposed to support energy storage or data processing applications.
Likely contacts
- Owner
- Riot Platforms
- Operator
- Riot Platforms
- Website
- riotplatforms.com
Contacts are model-researched from public web sources and shown only when a source is attached. Verify before outreach.