North Webb Industrial Park
Signal profile
- Power60% of score10029.0 MW est.Footprint × archetype W/m²
- Grid proximity25% of score970.2 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score70138 kV nearestHIFLD transmission
- Footprint100179.0 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence100100% fields · enrichedField coverage
Axes marked “% of score” are the weighted components of the headline composite (95). The rest are corroborating context.
Intelligence
The North Webb Industrial Park is a strong candidate for a small data center or container-BESS deployment due to its underutilized industrial site and proximity to a high-voltage substation. The key risk is the potential for increased logistics activity, which could lead to conflicts with data center operations. Further assessment is needed to determine the site's suitability.
The North Webb Industrial Park is a warehouse and logistics facility with a probable underutilization of its existing power infrastructure, making it an attractive candidate for a container-BESS or edge data center deployment. With an estimated load of 28.98 MW and a nearby 138 kV substation just 0.17 miles away, the site has a robust existing grid interconnection. The facility's single-story, 724,574 square foot layout provides ample space for containerized deployments, but the potential for increased logistics activity poses a risk to data center operations, highlighting the need for careful planning and coordination.
Likely contacts
- Operator
- North Webb Industrial Park, Ltd.
Contacts are model-researched from public web sources and shown only when a source is attached. Verify before outreach.
Underutilization signals
- David's Bridal, LLC (Houston North The Woodlands) · Woodlands, Montgomery County, TX41 layoffs · 2023-07-17T00:00:00.000