← All sites
Aerial view of Unnamed Manufacturing
Manufacturing·Probable

Unnamed Manufacturing

Estimated MW
6.1
 
Score
53
 
Nearest sub.
69 kV
670.5 mi away

Signal profile

Power74Grid proximity10Voltage class40Footprint62Underutilization82Data confidence80
  • Power60% of score74
    6.1 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    670.5 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint62
    2.5 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (53). The rest are corroborating context.

Underutilization signals

  • Millwood, Inc. · 5000 Proviso Dr Ste 1, Melrose Park, IL 60163underutilization_warn

Location

Coordinates
41.90848, -87.88662
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
6.1 MW