Manufacturing·Speculative
Usine de traitement des eaux de Pointe-Claire
243 Chemin du Bord-du-Lac–Lakeshore Pointe-Claire
Estimated MW
2.4
Score
33
Nearest sub.
69 kV
1353.2 mi away
Signal profile
- Power60% of score402.4 MW est.Footprint × archetype W/m²
- Grid proximity25% of score101353.2 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint481.5 acresOSM building footprint
- Underutilization35Estimate onlyTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (33). The rest are corroborating context.
Location
Coordinates
45.43073, -73.82215
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
2.4 MW