← All sites
Aerial view of Epic Piping
Manufacturing·Speculative

Epic Piping

2301 North Interstate 35 San Marcos

Estimated MW
5.4
 
Score
77
 
Nearest sub.
138 kV
0.2 mi away

Signal profile

Power72Grid proximity96Voltage class70Footprint81Underutilization35Data confidence80
  • Power60% of score72
    5.4 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score96
    0.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score70
    138 kV nearestHIFLD transmission
  • Footprint81
    6.7 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (77). The rest are corroborating context.

Location

Coordinates
29.90972, -97.90297
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.4 MW