← All sites
Aerial view of Owens Corning
Manufacturing·Speculative

Owens Corning

3700 I-35 Frontage Road Waxahachie

Estimated MW
15.8
 
Score
89
 
Nearest sub.
0.2 mi away

Signal profile

Power96Grid proximity97Voltage class50Footprint93Underutilization35Data confidence80
  • Power60% of score96
    15.8 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score97
    0.2 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score50
    HIFLD transmission
  • Footprint93
    19.5 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    75% fields · enrichedField coverage

Axes marked “% of score” are the weighted components of the headline composite (89). The rest are corroborating context.

Intelligence

The Owens Corning site is a strong candidate for a small data center or container-BESS deployment due to its proximity to a substation and potential underutilization of its existing industrial infrastructure. However, the lack of corroboration on underutilization and unknown substation voltage are key risks. Further research is needed to confirm the site's viability.

The Owens Corning site is a manufacturing facility with an estimated load of 15.76 MW, which suggests a significant existing electrical infrastructure. Given its proximity to a substation, just 0.17 miles away, the site could be an ideal location for a container-BESS or edge data center deployment, leveraging the existing grid interconnection. However, the speculative nature of the site and lack of information on underutilization and substation voltage introduce uncertainty, highlighting the need for further investigation to determine the site's suitability for such a project.

Location

Coordinates
32.44100, -96.84872
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
15.8 MW