← All sites
Aerial view of Cortex supercomputer
Manufacturing·Speculative

Cortex supercomputer

Estimated MW
7.9
 
Score
83
 
Nearest sub.
138 kV
0.4 mi away

Signal profile

Power82Grid proximity92Voltage class70Footprint89Underutilization35Data confidence80
  • Power60% of score82
    7.9 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score92
    0.4 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score70
    138 kV nearestHIFLD transmission
  • Footprint89
    9.8 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (83). The rest are corroborating context.

Location

Coordinates
30.21565, -97.61908
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
7.9 MW