← All sites
Aerial view of Amazon Distribution Center
Warehouse / Logistics·Probable

Amazon Distribution Center

Estimated MW
4.8
 
Score
49
 
Nearest sub.
69 kV
1132.8 mi away

Signal profile

Power67Grid proximity10Voltage class40Footprint96Underutilization82Data confidence80
  • Power60% of score67
    4.8 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1132.8 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint96
    29.3 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (49). The rest are corroborating context.

Underutilization signals

  • Thayer Distribution · Gibbstown, NJ128 layoffs

Location

Coordinates
39.92043, -75.23547
Archetype
Warehouse / Logistics
Confidence tier
Probable
Estimated load
4.8 MW