Warehouse / Logistics·Probable
Amazon Distribution Center
Estimated MW
4.8
Score
49
Nearest sub.
69 kV
1132.8 mi away
Signal profile
- Power60% of score674.8 MW est.Footprint × archetype W/m²
- Grid proximity25% of score101132.8 mi to substationHIFLD / SeerAI substations 2025
- Voltage class15% of score4069 kV nearestHIFLD transmission
- Footprint9629.3 acresOSM building footprint
- Underutilization82WARN-corroboratedTX WARN layoff notices
- Data confidence80100% fieldsField coverage
Axes marked “% of score” are the weighted components of the headline composite (49). The rest are corroborating context.
Underutilization signals
- Thayer Distribution · Gibbstown, NJ128 layoffs
Location
Coordinates
39.92043, -75.23547
Archetype
Warehouse / Logistics
Confidence tier
Probable
Estimated load
4.8 MW