Aerial view of Stony Point Processing & Distribution Plant
Manufacturing·Speculative

Stony Point Processing & Distribution Plant

70 Grassy Point Road Stony Point

Estimated MW
5.3
 
Score
51
 
Nearest sub.
69 kV
1224.1 mi away

Signal profile

Power71Grid proximity10Voltage class40Footprint80Underutilization35Data confidence80
  • Power60% of score71
    5.3 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1224.1 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint80
    6.6 acresOSM building footprint
  • Underutilization35
    Estimate onlyTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (51). The rest are corroborating context.

Location

Coordinates
41.22323, -73.96853
Archetype
Manufacturing
Confidence tier
Speculative
Estimated load
5.3 MW