← All sites
Aerial view of MTA East New York Shops
Manufacturing·Probable

MTA East New York Shops

Estimated MW
4.0
 
Score
43
 
Nearest sub.
69 kV
1215.7 mi away

Signal profile

Power58Grid proximity10Voltage class40Footprint76Underutilization82Data confidence80
  • Power60% of score58
    4.0 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1215.7 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint76
    4.9 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (43). The rest are corroborating context.

Underutilization signals

  • Christmas Tree Shops - Location 1 · Springfield, NJ143 layoffs
  • Christmas Tree Shops - Location 10 · Woodland, NJ58 layoffs
  • Christmas Tree Shops - Location 8 · Paramus, NJ48 layoffs

Location

Coordinates
40.67801, -73.89985
Archetype
Manufacturing
Confidence tier
Probable
Estimated load
4.0 MW