← All sites
Aerial view of Dependable Distribution
Warehouse / Logistics·Probable

Dependable Distribution

Estimated MW
5.7
 
Score
52
 
Nearest sub.
69 kV
1134.1 mi away

Signal profile

Power73Grid proximity10Voltage class40Footprint98Underutilization82Data confidence80
  • Power60% of score73
    5.7 MW est.Footprint × archetype W/m²
  • Grid proximity25% of score10
    1134.1 mi to substationHIFLD / SeerAI substations 2025
  • Voltage class15% of score40
    69 kV nearestHIFLD transmission
  • Footprint98
    35.3 acresOSM building footprint
  • Underutilization82
    WARN-corroboratedTX WARN layoff notices
  • Data confidence80
    100% fieldsField coverage

Axes marked “% of score” are the weighted components of the headline composite (52). The rest are corroborating context.

Underutilization signals

  • Thayer Distribution · Gibbstown, NJ128 layoffs

Location

Coordinates
39.98237, -75.23409
Archetype
Warehouse / Logistics
Confidence tier
Probable
Estimated load
5.7 MW